Results
The repair and system restoration were successfully completed within the required timeframe.
Key outcomes included:
- Full restoration of forward and aft propulsion control
- Successful sea trial testing
- Vessel operational performance verified
- Vessel sailed within the scheduled timeframe
- Avoided costly delays and operational disruptions